✨ Get 20% OFF your first order. ✨

Your Shopping Bag

Your bag is empty

Subtotal $0.00
Shipping Calculated at checkout
Continue Shopping

Overstock Deal Boss Zone 1 Double Width Grp Fibreglass Tower - 4.2 M Platform Height Massive 70% Savings [iragHckD]

$184.99 $591.99 -69%

Superior Safety in Construction: Boss Zone 1 TowerIntroducing the BoSS Zone 1 Double Width GRP Fibreglass Tower with a 4.2 m platform height, the ultimate choice for safety and durability in your construction projects. Engineered to meet the stringen

Secure Shopping

100% Safe Guarantee

Free Shipping

On orders over $30

Money-Back

30-Day Guarantee

Superior Safety in Construction: Boss Zone 1 Tower

Introducing the BoSS Zone 1 Double Width GRP Fibreglass Tower with a 4.2 m platform height, the ultimate choice for safety and durability in your construction projects. Engineered to meet the stringent standards of EN131, this fibreglass scaffold tower is designed for use in environments where the highest level of safety is paramount. Its non-conductive, non-sparking, and non-corrosive properties make it an ideal solution for Zone 1 areas where an explosive atmosphere is likely to occur.

Robust Features for Unmatched Performance

Boasting a safe working load of 225 kg, the Boss Zone 1 GRP Fibreglass Tower is built to withstand the rigors of demanding work environments. Its 3T erection method simplifies assembly and disassembly, ensuring a quick and efficient setup. The adjustable legs provide stability and adaptability to various terrains. Key features include:

  • Non-Conductive: Safely used in high-risk areas without the risk of electric shock or fire hazards.

  • Non-Sparking: Reduces the risk of accidental sparks, crucial in explosive atmosphere environments.

Multi-Environmental Versatility

The Boss GRP 3T Tower is suitable for a range of environments, making it an essential tool for both industrial and manufacturing processes. Whether you're working in a fire-prone area, dealing with chemicals, or operating in a 'clean' environment such as food processing or hi-tech manufacturing, this fibreglass tower provides the reliability you need. With its non-oxidising and non-corrosive properties, the Boss Zone 1 Tower stands the test of time and harsh conditions.

What Our Customers Say

January 1, 2026

Absolutely no complaints!

I am really enjoying this product.

- Arianna T..

January 1, 2026

Absolutely no complaints!

I am amazed at the build quality.

- Armani G..

January 1, 2026

Absolutely no complaints!

It really does the business.

- Millie M..

Write a Review

You Might Also Like

Discover more great products from our collection.

SALVADOR 1914 CANCELLATION

SALVADOR 1914 CANCELLATION

(969)
$18.99 $60.99 -69%

Copyright 2026 © mappa-mercia.org

VISA
PayPal
Stripe
Mastercard
CASH ON DELIVERY