Massive Discount Solaredge Home Battery V2 10kwh 1ph Package Limited Time 75% Off [wS0yPQZg]
This part is made up of the following items: 1 x SE-BATTERY02-10KWH SolarEdge Home Battery - 1PH 400V 9.7kWh Battery v02 1 x SE-WND-3Y400-MB-K2 1PH/3PH 230/400V SolarEdge Energy Meter K2 with Modbus Connection 1 x IAC-RBAT-HANDLE-01 SolarEdge Handle
Secure Shopping
100% Safe Guarantee
Free Shipping
On orders over $30
Money-Back
30-Day Guarantee
| 1 x SE-BATTERY02-10KWH | SolarEdge Home Battery - 1PH 400V 9.7kWh Battery v02 | |
| 1 x SE-WND-3Y400-MB-K2 | 1PH/3PH 230/400V SolarEdge Energy Meter K2 with Modbus Connection | |
| 1 x IAC-RBAT-HANDLE-01 | SolarEdge Handles for Manoeuvring Home Battery 400V | |
| 1 x SE-CT-SPL-100A-A | 100A Split-Core Current Transformer for SolarEdge Energy Meters with Modbus Connection | |
| 1 x IAC-RBAT-RWYCBL-01 | SolarEdge Branch Connectors for Home Battery 400V | |
SolarEdge Energy Bank 10kWh V2 Battery. Optimized for SolarEdge StorEdge with HD-Wave/ Home Wave technology inverters. Integrates with the complete SolarEdge residential offering, providing a single point of contact for warranty, support, training, monitoring and simplified logistics.
You will need to add a plug in which is dependent on the type of inverter you wish to connect:
- The SetAPP Inverters require the part code: ENET-HBCL-01
- The NET Inverters require the part code:
Please note this package includes the Energy Net Plug-In for the SetApp inverter range, for communication between the inverter and battery, 4 x handles for the carrying and manoevering of the battery and a pair of Staubli MC4 Y connectors in case the systems PV inverter only has 1 pair of DC inputs. These ancillaries may not be required for every installation so please feel free to check and remove any items you do not require.
You may also want to consider IAC-RBAT-FLRSTD-01 if you wish to floor mount this battery. Additionally please note if the installation already has a SolarEdge Modbus meter, the additional meter in this system (part code: SE-WND-3Y400-MB-K2) will not be required. Finally, if this is not your first installation you may already have IAC-RBAT-HANDLE-01 (handles for lifting the battery) in which case these can also be removed from the package.
Please contact us if you have any questions.
Please note installers must be trained and certified in order to install this battery. Installer certification course is available in the Solar Edge Edge Academy .
- Weight:
- 120.891 kg
What Our Customers Say
Absolutely no complaints!
I'm impressed by the thoughtful features included in the design.
- Alivia V..
Absolutely no complaints!
This product is a superb performer. It's efficient and totally reliable.
- Howard F..
Absolutely no complaints!
The construction is solid and the materials are high quality.
- Rosie B..